Rema Tip-Top

Rema Tip-Top

Overview
Milestone delivered roofing upgrades and solar PV installations across two sites in Doncaster and Leeds, improving building performance and supporting sustainability goals.

Key Works

  • Installed scaffolding and netting to ensure safe access
  • Overclad existing asbestos roofs with twin skin insulated cladding systems
  • Installed bespoke solar PV systems at both sites
  • Delivered a 44-panel system at Doncaster and a 168-panel (104kWp) system at Leeds
  • Integrated all electrical elements to maximise on-site energy use

Outcome
The upgraded roofs improve insulation and longevity, while the PV systems generate 126,900 kWh annually, cutting carbon by 59,600 kg per year and delivering strong long-term energy savings.