Food Production – Facility Works

Food Production – Facility Works

Overview
Conversion of an existing warehouse into a fully functional crisp production facility.

Key Works

  • Structural & Drainage: Removed existing concrete slab for new drainage, piling, and failure points; installed new sub base to design; fitted stainless steel foul drainage and linear channel drains; reinstated concrete where removed.
  • Foundation Prep: Constructed pile mat and completed trial holes for service investigation.
  • External Works: Tarmac surfacing, Aco drain installation, Concrete yard pour, Electrical ducting, Light columns installation, Dock leveller fit-out

Outcome
Delivered a robust, hygienic, and efficient facility ready for crisp production, meeting structural and operational requirements.